Assembly Flight 5A


   Assembly Flight 4A Assembly Flight 5A.1  

Launch Date: February 7, 2001 COMPLETED
Launch Vehicle: US Space Shuttle Atlantis: STS-98
Elements: Destiny Laboratory Module
  • Installation of U.S. Lab "Destiny" MPEG animation (1.8 M)
  • Destiny Laboratory provides initial US user capability.
  • Destiny is launched with 5 system racks already installed inside of the module.
  • Control Moment Gyroscopes are activated with delivery of electronics in lab, providing electrically powered attitude control.

Pages mainteinded by
Claudio Ariotti, IK1SLD



Credits